Buderus Logano GE315 Installation And Maintenance Instructions Manual page 28

Cast iron sectional boiler for oil or gas pressure jet burners
Table of Contents

Advertisement

2
Burner installation
Position the top at the front (Fig. 36, Item 1) between
the side walls so that the cut-out engages (Fig. 36,
Item 3) above the cross support bracket.
Secure the top with one self-tapping screw on each
(Fig. 36, Item 2) of the side walls.
Install the control unit, position the capillary tubes
and the sensor well and insert the sensors into the
wells, before any other hood components are
positioned (see chapter 2.8 "Control unit", page 30).
Position the rear hood (Fig. 37, Item 1) between the
side walls, so that the cut-out engages (Fig. 37,
Item 2) above the cross support bracket.
Push the plinth rails (front and back) (Fig. 38, Item 2) on
the lower side wall edge and secure on their sides with
one self-tapping screw each (Fig. 38, Item 1 & 3).
28
1
Fig. 36
1
Fig. 37
3
2
Fig. 38
We reserve the right to make any changes due to technical modifications.
Installation and maintenance instructions Logano GE315 • Issue 02/2006
Installation of the front hood
1
2
Installation of the rear hood
Installation of the front plinth rail
2
3
2
1

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents