Daily Maintenance Schedule - Powermate LiftGate LG-3 Installation & Operation Manual

Table of Contents

Advertisement

DAILY MAINTENANCE SCHEDULE

 Inspect unit frames for structural damage.
 Inspect frame hinge points. Apply LPS silicone lubricant (non-flammable)
if required.
 Inspect all bolts and fasteners are in place and secure.
 Inspect the load straps for damage. Nicks or tears are not acceptable.
 Inspect the push button switch and rocker switch for condition and
operation. Make sure the wiring is secure.
 Test the battery disconnect switch for operation. Cycle the unit testing for
operation, direction and smoothness.
 Check that the toeplate is secure and not bent.
 Observe the roller operation in the outer frame
rails. Oil rollers as required.
 Ensure the operation manual is readily
available for reference.
FOR PARTS AND SERVICE CONTACT:
1-800-697-Mate
®
PowerMate
LiftGate™ Installation & Operation Manual
 
8.05
 
PN 018820 Rev.D2
Eng. 01/ 10/ 13
 
 

Advertisement

Table of Contents
loading

This manual is also suitable for:

Liftgate lg-5Liftgate seriesLiftgate lg-6

Table of Contents