Installing The Liftgate Unit - Powermate LiftGate LG-3 Installation & Operation Manual

Table of Contents

Advertisement

INSTALLING YOUR PowerMate® LiftGate
STEP 2:
Installing the Unit
C.
Proceed to drill the marked large hole and 13/32"
holes into the floor of the vehicle. Use as many
bolt holes in the Base as possible.
NOTE:
In some instances it may not be possible to utilize
all the bolt holes due to the structuring underneath
the
vehicle floor. In these cases, additional holes can
be added.
CAUTION!!
Be sure to not drill into anything vital under
the floor.
D.
Reposition the PowerMate® LiftGate
the marked outline, lining up the large hole with the
Main Post. Tip the Unit back to fish out the two
wires hidden in the Main Post. Direct the wires
through the large hole in the floor.
CAUTION!!
Care must be taken not to damage the
wires.
E.
The installer is required to reinforce the Unit under
the floor, below the Base Plate, with Steel Flatbar,
Angle, and/or C-Channel.
NOTE:
Reinforcing steel will need to be measured, cut to
size and drilled with 13/32" holes.
®
PowerMate
LiftGate™ Installation & Operation Manual
Unit over
3.09
 
PN 018450 Rev.D2
Eng. 01/ 10/ 13

Advertisement

Table of Contents
loading

This manual is also suitable for:

Liftgate lg-5Liftgate seriesLiftgate lg-6

Table of Contents