Roller Replacement - Powermate LiftGate LG-3 Installation & Operation Manual

Table of Contents

Advertisement

ROLLER REPLACEMENT

STEP 1. Provide a support to be placed underneath the
Toeplate to support the Outer Frame when the
unit is extended approximately six inches.
STEP 2. Swing the Lift Gate unit out of the vehicle and
engage the lock pin. Extend the Lift Gate Unit
until the Toeplate comes to rest on the support.
Remove the fuse from the Switch Control Box.
STEP 3. Remove the four 1/4-20NC Lock Nuts retaining
the two bottom Clevis Mounts. This dis-engages
the Outer Frame from the Actuator.
STEP 4. Manually lift the Outer Frame to until the Rollers,
at the top and bottom, are completely exposed.
Re-support the Toeplate to hold the Outer Frame
in this raised position.
STEP 5. Remove the old Rollers and wipe the Roller Axles
clean. Remove any nicks or burrs on the axles.
STEP 6. Apply a light machine lubricant to the four Roller
Axles and install the new Rollers. Wipe off
excess lubricant.
STEP 7. Supporting the Outer Frame, remove the support
underneath the Toeplate. Lower the Outer Frame
to re-engage the Rollers in the Inner and Outer
Frames. Continue to lower until the Toeplate
rests on the first support.
STEP 8. Re-attach the bottom Clevis Mounts and secure
with the four 10-24NC Lock Nuts.
STEP 9. Re-install the 30A Fuse into the Control Box.
Activate the Unit to raise the Toeplate off the
support. Remove the support and test operation
of the unit. Insure that all guarding is in place.
Toeplate
1/4-20NC Lock Nuts(4)
®
PowerMate
LiftGate™ Installation & Operation Manual
 
 
Switch Control Box
Outer Frame
Bottom Clevis Mounts
Roller
Roller Axle
5.06
Fuse
 
Rollers
Roller Axles
Inner Frame
Roller
PN 018890 Rev.D2
Eng. 01/ 10/ 13

Advertisement

Table of Contents
loading

This manual is also suitable for:

Liftgate lg-5Liftgate seriesLiftgate lg-6

Table of Contents