Base Hole Locations - Powermate LiftGate LG-3 Installation & Operation Manual

Table of Contents

Advertisement

B.
Position the Unit in the vehicle and mark the outline of the Base Plate on the floor.
Using a transfer punch and the Unit Base as a template, mark the bolt hole
locations on the vehicle floor. Move the Unit out of the way. Using the dimensions
provided in the sketch below, mark the center point of the large hole.
CAUTION!!
Before any holes are made in the vehicle floor, ensure the following: The large
hole for the wiring must not damage the vehicle's supporting structure. Check the
underbody of the vehicle to ensure the hole locations will not interfere with brake
or fuel lines, fuel tank, wiring, or any other critical areas of the vehicle. If the area is
not free of obstacles, re-position the Unit and repeat this step.
.750
4.625
15.500
20.000
This area is removed on the
LG-3 Righthand Base Plates.
PowerMate
12.000
6.000
3.000
2.875
POWERMATE LIFTGATE

BASE HOLE LOCATIONS

3.08
®
LiftGate™ Installation & Operation Manual
 
.438
.750
Make 1" to 2" hole at
this location for wiring to
pass through floor of
vehicle.
Drill
floor as required. Be cautious of
what may be on the bottom side.
Utilize as many hole positions as
possible. Additional holes may be
drilled through the Base Plate if
necessary.
3.500
.750
 
13/32"holes through vehicle
This area is removed on the
LG-3 Lefthand Base Plates.
PN 018440 Rev.D2
Eng. 01/ 10/ 13
 

Advertisement

Table of Contents
loading

This manual is also suitable for:

Liftgate lg-5Liftgate seriesLiftgate lg-6

Table of Contents