Re-assembling and filling the loading cylinder
E
Fig. 42
1. Reconnect the loading cylinder to the pipework.
2. Insert new gasket
A
3. Fit flange cover
B
and tighten 8 screws
maximum torque of 25 Nm.
D
C
B
A
underneath flange cover
B
D
with a
Commissioning, inspection, maintenance
4. Push earth cable
.
5. Fit cover
(two-part design up to 26 kW).
E
6. Fill the loading cylinder with potable water.
onto the tab.
C
49