Filling the loading cylinder on the DHW side

Fig. 22
1. Valves
and
must be in the "top" position.
A
B
2. Open the cold water line and a DHW draw-off
point.

Checking all connections on the heating water and DHW sides for leaks

Danger
There is a risk of electric shock from escaping
heating water or DHW.
When commissioning and after carrying out
maintenance work, check all water side connec-
tions for leaks.
A
B
Commissioning, inspection, maintenance
3. Once air stops coming out of the DHW draw-off
point, the loading cylinder is completely filled.
!
Please note
Leaking hydraulic connections lead to appliance
damage.
Check the internal and on-site hydraulic con-
nections for leaks.
In the event of leaks, switch off the appliance
immediately. Drain the heating water. Check
the seating of seal rings. Always replace dis-
placed seal rings.