Ground Stack Deployment; Overview - Martin Audio Wavefront Precision Series User Manual

Optimised line array
Table of Contents

Advertisement

WPS USER GUIDE

Ground Stack Deployment

Overview

For ground stacking first find a suitable safe, flat surface and place the WPS flying frame in position.
Remove the pins securing the front flip-up bars and swing the bars up until they are vertical.
Fit an outrigger bracket into position in both front rigging positions. These fit into the slot vacated by the flip-up bar. If you have pinned
the bar in the vertical position remove the pin, hold the bar vertical and place the outrigger in position. Replace the upper pin and add a
second pin in the lower hole. Repeat for the other side.
x 2
x2
The grid is now ready for the ground stack bar.
WPS USER GUIDE V1.0
40
Copyright © 2019 Martin Audio Ltd.

Advertisement

Table of Contents
loading

This manual is also suitable for:

Wps

Table of Contents