2.5 Location Setup
Foundation
The appliance must be installed level, on a housekeeping pad, to function properly. Ensure the base is
securely connected to the appliance. Use a bubble level and make sure housekeeping pad is level
before installation of appliance. There are four
anchor bolts. Two of these are located inside the cabinet and the other two are outside.
housekeeping pad must be at least 4 inches in height.
NOTICE! The appliance may be installed on a combustible floor; however, the appliance must
NEVER be installed on carpeting.
NOTICE! Check the rating plate for indoor or outdoor use.
Revised: October 2, 2019
Released: October 2, 2019
3/4" holes in the base which may be used for 5/8"
Patterson-Kelley 2019
All Rights Reserved.
P-K Storm
TM
Gas Fired Boiler
Technical Service 1.877.728.5351
QTY 2: 3/4" Holes
Anchor/Lag Bolts
(FRONT inside
cabinet)
QTY 2: 3/4" Holes
for
Anchor/Lag Bolts
(REAR)
2691000099 P-K Storm Installation and Owners
The
for
Manual.docx
Page 5