Gas Piping Considerations; Water Quality Standard; Installation; Overview - Patterson-Kelley P-K STORM ST-1250 Installation & Owner's Manual

Gas fired boiler w/ nuro control system. natural gas boilers
Table of Contents

Advertisement

2.7 Gas Piping Considerations

Before making the gas hook-up, make sure the boiler is being supplied with the type of fuel shown on
the boiler nameplate.
The boiler shall be installed such that gas ignition system components are protected from water
(dripping, spraying, rain, etc.) during appliance operation and service (circulator replacement, control
adjustment, etc.).

2.8 Water Quality Standard

boiler's heat exchanger is made of stainless steel. The heat exchanger requires
The P-K STORM
proper water
conditions to remain efficient and function properly. For more information, refer to Harsco
Industrial, Patterson-Kelley's Water Quality Standards for Hydronic Boilers in Multi-Metal Systems in
Appendix C – Water Quality Standards Quality Standards for Hydronic Boilers in Multi-Metal
Systems, as this applies to the warranty of your heat exchanger.
NOTE: Failure to maintain the water quality according to the requirements of the multi-metal
systems water quality standards can void the heat exchanger warranty.

3 Installation

3.1 Overview

For site preparation follow the guidelines established in Section 2. Section 3 details the installation
requirements for electrical connections, combustion air, and flue vent piping, hydronic piping, etc.

3.2 Appliance Connections

The table below summarizes the appliance connections to the P-K STORM
Boiler Model
Power Requirement
Air Intake Connection
Nominal Exhaust Vent
Connection
Condensate Drain
Heat Exchanger Drain
Natural Gas Shutoff Valve
HWR Connection
HWS Connection
Revised: October 2, 2019
Released: October 2, 2019
Supplying a fuel other than that shown on the appliance's
nameplate can lead to over firing of the appliance. This can
cause damage to the equipment which could result in serious
injury and/or death.
ST-1250, ST-1500, ST-1750 & ST-2000
 Patterson-Kelley 2019
All Rights Reserved.
P-K Storm
Technical Service 1.877.728.5351
208-240/1/60 VAC
8"
8"
3/4" CPVC Pipe
3/4" NPT-F
1-1/2" NPT-F
2-1/2" Grooved (Carbon Steel)
2-1/2" Grooved (Carbon Steel)
2691000099 P-K Storm Installation and Owners
TM
Gas Fired Boiler
series boilers:
Manual.docx
Page 12

Advertisement

Table of Contents
loading

This manual is also suitable for:

P-k storm st-1500P-k storm st-2000P-k storm st-1750

Table of Contents