Install Power Cord Seal (OUTDOOR BOILERS)

(Customer Supplied)
For this OUTDOOR boiler use water proof conduit and sealtight connectors to the boiler. Before starting
the boiler, check to ensure that the proper electrical service is connected to the boiler.

High Voltage (TB2) Terminal Block

HOT L1 – Connect the 1
TB2-1 terminal.
HOT L2 – Connect the 2
TB2-2 terminal.
Revised: October 2, 2019
Released: October 2, 2019
st
hot lead of the 208-240VAC, single phase, 60Hz electrical service to the
nd
hot lead of the 208-240VAC, single phase, 60Hz electrical service to the
 Patterson-Kelley 2019
All Rights Reserved.
P-K Storm
TM
Gas Fired Boiler
Technical Service 1.877.728.5351
Be sure to check the
nameplate on the boiler
before connecting the
electrical supply.
N
!
OTICE
A dedicated earth ground
(green wire) is required to
avoid nuisance shutdowns.
Do not ground through the
conduit!
The high voltage (TB2)
terminal block on the STORM
with NURO controls contains
two hot leads (HOT L1 & HOT
L2), a neutral lead (NEUTRAL)
and a ground lead (GROUND)
for 208- 240 VAC, single
phase 60Hz electrical supply.
This terminal block (TB2) also
contains dry-contact relays
with a maximum voltage
rating of 120VAC and 1/2 Amp
maximum current capacity.
Incorrect wiring can result in
equipment damage, injury, or
death.
NOTE
Recommended to use 10 AWG
or 12 AWG for the Ground,
Neutral, Hot L2, and the Hot L1
Terminals
2691000099 P-K Storm Installation and Owners
Manual.docx
Page 15

Advertisement

Table of Contents
loading

This manual is also suitable for:

P-k storm st-1500P-k storm st-2000P-k storm st-1750

Table of Contents