Figure 18.14
3. Check the condition of the electrodes, if necessary replace them.
Reassembly the electrodes equipping them with new gaskets and respecting the location of each electrode
as well the tightening torque of the 4 screws of 2.5Nm (22.1 inch Lbs).
Figure 18.16
4. Check the position of the electrodes against the burner, as well as the distance of the ignition electrodes
wires.
Correct the electrodes gap if necessary
Figure 18.17
5. Reassemble the burner door set on the heat exchanger following the tightening torque of the nuts of 5 Nm (44.3
inch Lbs).
144
E93.1901EN032 Installation and Service Manual SlantFin VGH-CH / CO
2 dots of glue silicone «Loctite 5366 ou Ottoseal S17»
Figure 18.15
Figure 18.18