Steam Generator; Steam Generator Removal And Replacement - Vulcan-Hart C24EA Series Service Manual

Electric convection steamers
Hide thumbs Also See for C24EA Series:
Table of Contents

Advertisement

C24EA SERIES ELECTRIC CONVECTION STEAMERS - STEAM GENERATOR
STEAM GENERATOR REMOVAL
AND REPLACEMENT
1.
Turn off machine to drain steam generator. Allow
steamer to complete drain cycle.
A.
Turn off water supply.
2.
Remove FRONTBASE PANEL, and LEFT and
RIGHT SIDE BASE PANELS from generator
base and COOKING COMPARTMENT RIGHT
SIDE PANEL as outlined under COVERS AND
PANELS.
3.
Remove HEAT EXCHANGER.
4.
Remove VACUUM RELIEF SOLENOID.
5.
Disconnect compressions fittings then remove
condensate coil tubing.
6.
Remove delime hose from water level probe
housing.
NOTE: Use new band clamps when connecting
hoses. See TOOLS.
Fig. 71
7.
Disconnect pop-off tubing then remove relief
valve from steam generator.

STEAM GENERATOR

Page 51 of 75
Fig. 72
8.
Disconnect compression fitting then remove the
fill piping assembly from steam generator fill
tube.
Fig. 73
9.
Remove MOTORIZED DRAIN VALVE.
10. Remove HEATING ELEMENTS from steam
generator.
11. Remove high voltage control box from steamer.
A.
Disconnect electrical supply connections
from terminal block and ground.
B.
Disconnect two wiring harness connectors.
C.
Remove four bolts securing high voltage
control box to frame.
F35453 Rev. A (0119)

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

C24ea6C24ea10

Table of Contents