Pressure Relief Procedure; Shutdown - Graco Reactor E-10hp Instructions Manual

Hide thumbs Also See for Reactor E-10hp:
Table of Contents

Advertisement

Operation

Pressure Relief Procedure

Follow the Pressure Relief Procedure whenever
you see this symbol.
This equipment stays pressurized until pressure is
manually relieved. To help prevent serious injury from
pressurized fluid, such as skin injection, splashing
fluid and moving parts, follow the Pressure Relief
Procedure when you stop spraying and before
cleaning, checking, or servicing the equipment.
1. Engage piston safety lock or trigger safety lock.
Fusion
2. Set function knob to Stop/Park
2
1
0
+
-
3. Turn Recirc/Spray valves to Recirc. Fluid will be
dumped to supply tanks. Pumps will move to the
bottom of their stroke. Ensure gauges drop to 0.
24
Probler
.
3
4
5
6
7
8
9
10
ti21490a
ti21495a

Shutdown

For longer breaks (more than 10 minutes) use the
following procedure. If you will be shutdown for more
than 3 days, first see Flushing, page 26.
1. Shut off Heater Power.
2. Shut off Motor Power.
3. Follow all steps of the Pressure Relief Procedure,
page 24.
4. Close the gun fluid valves ISO and RES. Doing this
will keep the internal parts of the gun cleaner and
prevent crossover.
Fusion
5. Refer to your separate gun manual and perform
Shutdown procedure.
Probler
332144H

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents