Download Print this page

Teledyne Frontline Sodera Quick Start Manual page 5

Wideband bluetooth protocol analyzer

Advertisement

5. Applying Power
The Sodera hardware is powered by three methods: the Frontline supplied AC-to-DC adapter, an external DC power source that can
include power from an automobile auxiliary power source and an optional internal battery.
To apply power to Sodera use one of the three methods:
1. Connect the provided AC-to-DC power adapter to the
an AC source.
2. Connect a DC power source supplying +12 VDC directly to the
3. Install the battery.
To start Sodera , depress the Power button on the front panel for at least 1/2 second and then release . This action will provide a clean
start for Sodera hardware. The battery charge state indicator LEDs will repeatedly flash in sequence while the unit powers up.
The front panel
indicator LED will be green.
Power
Should the front panel
Power
between 50 °C and 60 °C (122 °F and 140 °F) and should be shut down. When the hardware reaches thermal overload it will
automatically shut down and the
6. Sodera Data Capture Method
When the Frontline Sodera is connected to the Host PC running Frontline Protocol Analysis System software the
window will display the Sodera options.
Method...
Frontline Technical Support: Phone +1-434-984-4500 or email tech_support@fte.com
ComProbe 802.11 Back Panel
indicator begin blinking red, the Sodera hardware is approaching thermal overload temperature
indicator will be a constant red.
Power
connector on the rear panel and then connect the adapter into
+12VDC
connector on the rear panel.
+12VDC
Select Data Capture

Advertisement

loading