SM 3477
2
.
Verify that the processor is switched off.
3
.
Use AIR METER TL-2431 to measure negative static pressure in the EXHAUST
DUCT 30.5 cm (12 in.) from the end that is connected to the processor.
4
.
Adjust the gap between the BUILDING EXHAUST DUCT and the DUCT from the
PROCESSOR to obtain the required static pressure.
DUCT DIAMETER
76 mm (3 in)
102 mm (4 in)
5
. Connect the EXHAUST HOSE to the EXHAUST CONNECTION of the PROCESSOR.
Do not run the ML2000 P as long as the negative pressure of the EXHAUST is not correct !

FINAL CHECK-OUT:

1
.
Run the MINILOADER in continuous cycle, look and listen to all functions:
CASSETTE opening
FILM pick-up from CASSETTE
MAGAZINE opening
FILM pick-up from MAGAZINE
BLOW PIPE function
2
.
Mount all PANELS.
3
.
Clean all PANELS.
KODAK AG, Stuttgart
figure 6-5
Negative Static Pressure, Water Head
MIN
0.76 mm (0.03 in)
0.25 mm (0.01 in)
CAUTION:
Incorrect venting may cause serious damage.
6-5
PREVENTIVE MAINTENANCE
MAX
1.02 mm (0.04 in)
0.51 mm (0.02 in)
6/1997