Download Print this page

Operation Instructions - Vulcan-Hart VHU18 Installation & Operation Manual

Insulated humidified holding & proofing cabinet
Hide thumbs Also See for VHU18:

Advertisement

VHU18 INSULATED HUMIDIFIED HOLDING & PROOFING CABINET
The Cabinet and its parts are hot. Be very careful when operating,
cleaning, or servicing the cabinet. Heating elements are located at the bottom of the unit.
Touching the floor of the internal cavity or water pan can result in injury.
CONTROLS – Must read and familiarize before operation.
1
1. ON/OFF Rocker Switch
2. Temperature Display and Control Knob
Shows Temperature set point selected by operator (See Start Up).
Upon pressing knob once, reading of cabinet interior temperature will display for
4 seconds, then switch back to showing set temperature.
3. Humidity Display and Control Knob
Shows Relative Humidity set point, either the default for that temperature, or
specific humidity set point selected by operator (See Start Up).
Upon pressing knob once, reading of cabinet interior relative humidity will display
for 4 seconds, then switch back to showing set humidity.
4. Vent Fan and Guard
Provides air intake for maintaining dry and cool controls.
Leave at least a 1-inch clearance on all sides to prevent premature failure of
controls from humidity.
Do not allow liquids into the vent.

OPERATION INSTRUCTIONS

4
2
6
3
F-47668 (02-18)

Advertisement

loading