Land Pride
SECTION 1: OPERATOR CONTROLS
9. Insert park linkage rod through frame and attach to the
park lever shaft weldment.
NOTE: Ensure that the park linkage rod is correctly
aligned under the control pivot shaft.
10. Secure park linkage rod to park lever shaft weldment
with cotter pin and hardware.
photo zsm111
11. Align and install park linkage rod into the control pivot
shaft.
12. Align and install park return link onto park linkage
rod.
NOTE: Ensure that the curve of the return park link is
installed toward the control pivot shaft.
13. Secure return park link and park linkage rod with hair
cotter pin.
photo zsm081
14. Align and install brake return spring from battery
hold-down post and park return link.
15. Align and install battery hold-down bracket.
16. Reconnect battery and remove chocks from wheels.
photo zsm015
8
Z44 and Z52 Accu-Z Razor (S/N 472620 and above) Riding Mowers 357-044SM
9/24/09