Commissioning and decommissioning

6
Commissioning and decommissioning
This chapter briefly describes the main points for the commissioning and decommissioning of the
measurement device. All newly delivered devices already have a basic or factory setting so they
can perform the measurement task. If necessary, customer-and system-specific settings have to
be made.
Do not perform any of the work described in this chapter if you do not have
the permission and necessary instructions from Elster GmbH or their
representatives!
In addition, commissioning may only be carried out by qualified service people. Elster GmbH
offers the necessary device-specific service- and commissioning training courses.
The presence of an authorizied metrology expert is required for final
commissioning of the device, when it is used for the scope of fiscal metering.
In this case, the conditions of the applicable approval must be observed as well.
This is ensured by means of a corresponding file, called approval file, in the
device. This file will make the device settings compliant. Details please see
chapter 8.

6.1 Preconditions for commissioning and operation

All safety notes and warning instructions in chapter 2 have to be observed and the device has to
be mounted and installed according to the instructions in chapter 5. In particular:
The gases are at the correct pressure and temperature, a calibration gas cylinder is properly
connected to the device. The components of the calibration gas mixture are written into the device
(see chapters 7 and 8)
Power supply and communications are carried out properly. The delivery is
less than 1 year ago (battery charge more than 20%). The device housing is
completely closed. No condensation water inside the device*.
* Ensure that the Q2 is put into operation only without condensation inside. Check drop formation in the
connection box. Open according to chapter 6.2.2, after checking, close the box again. If condensation has
formed, this must first evaporate. In case of doubt, you have a waiting period of about 12 hours or please
contact Elster GmbH.
The rules in force concerning sealing and housing seal must be observed
in fiscal operation.
Regulations for explosion protection and safety must be observed
especially during commissioning in an area with a potentially explosive
atmosphere.
GasLab Q2
G a s Q u a l i t y A n a l y z e r
6
Page 41 of 135