Connecting To External Equipment; Setting And Test Operation - Panasonic CZ-256ESMC3 Technical Data Manual

Intelligent controller & communication adaptor
Hide thumbs Also See for CZ-256ESMC3:
Table of Contents

Advertisement

Installation Instructions
Wiring
(continued)
Pass
through the power-in port.
Power supply terminal board (TB1)
Power switch
ON
L
Power supply
N
wiring
OFF
(AC100
~240V)
Clamper
(supplied)
The earth wiring for
protection should be longer
Earth terminal
than the power line (L, N).
board
(Protective earth)
z If the power supply wiring is mistakenly connected
to a terminal board other than the power supply
terminal board, the devices connected to this
controller or this controller will malfunction.

Connecting to External Equipment

• Non-voltage contact "a"
• Keep the external I/O wiring lengths of 20 meters or less. If a longer length is needed, use a Communication Adaptor or relay.
• A voltage of DC5 V (approx. 10 mA) is applied to the contact to detect the input signal.
• Do not apply an external voltage to the input terminal.
• The contact allowable voltage and current for the output signal terminal are max. DC30 V and 0.5 A respectively.
Pulse meter input
(Non-voltage contact "a" Pulse)
Common (COM1)
Pulse meter input (Pi1)
Pulse meter input (Pi2)
Pulse meter input (Pi3)
• Minimum pulse width: 30 msec
or more, or 100 msec or more
(selectable by setting)
• Minimum pulse interval: 1 sec

Setting and Test Operation

 Turn on all of the indoor units and the outdoor units.
 Turn on the Communication Adaptor (only when
connected), and make the necessary settings.
(See "Installation Instructions" supplied with the
Communication Adaptor.)
 Turn on this unit.
 Attach the power switch cover to the original position.
• Do not allow the wirings to be caught.
 Refer to "Quick Reference" and check the following.
• Check if the clock setting and the number of connected
units are correctly displayed.
Clamper
(supplied)
Signal terminal board (TB2) connection
Connect the shield wiring for the inter-
unit control wiring to ground. (FG
Connect to inter-unit control wiring (LINK1)
Connect to inter-unit control wiring (LINK2)
0
1
2
Equipment side
3
7
4
8
5
9
6
10
7
8
9
10
11
Signal terminal board (TB2)
12
13
ON
OFF
LAN
Cable
LAN
terminal
Fix
securely.
FG*
) .
*4
U1
U2
U1
U2
External output
(Non-voltage contact "a" Static)
14
Common (COM2)
15
Digital output1 (DO1)
16
Digital output2 (DO2)
17
18
• Minimum application load: DC5V 1mA
19
External input
20
(Non-voltage contact "a" Static)
21
Common (COM3)
22
Digital input1 (Di1)
23
Digital input2 (Di2)
Digital input3 (Di3)
25
*5: When performing the demand control,
26
connect to External input (Di) terminal.
• Set the central address.
• Make other necessary settings (unit name, area setting,
distribution setting, etc.).
• Check if the indoor unit, etc. can be operated properly
using this unit, and correct statuses are displayed.
 Refer to one of "Service Manual", "Test Run
Service Manual" and "Technical Data", and check
the following.
• Make the communication setting with the air conditioner.
• Check and confirm the connection configuration.
5
ー 153 ー
Intelligent Controller
*4: Functional Ground
Use these screws when connecting the shield
wiring to ground (FG
).
*4
Inter-unit
control
wiring
Communication
Adaptor control
wiring
E xternal
equipment
connection
terminal
(See "Connecting to External
Equipment")
Signal terminal board (TB2)
4
FG*
4
Connect the Communication
Adaptor control wiring.
+
(ADAPT +,-,FG*
-
Equipment side
17
18
19
*5
Equipment side
20
21
22
23
)
4

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Cz-cfunc2

Table of Contents