Read Controller Status - Omron KP**G-OD Series Communications Manual

Grid connect photovoltaic inverter
Table of Contents

Advertisement

3-4-5

Read Controller Status

This service reads the operating status and error status.
Command
 Service Request PDU
MRC
SRC
0
6
0
2
2
Response
 Service Response PDU
MRC
SRC
0
6
0
1
2
2
(1) Operating status
Operating status
MSB
(Bit)
0
1
0
1
0
0
0
1) Instruction status of KP inverter.
2) 3) The grid relay ON/OFF status
In KP40G, 4 relays are built into. It is occupied whether to have turned on both of relays of a side
nears the grid (Relay3/4) among these. Similarly it shows whether to have turned on the relay of a
side near the inside (Relay1/2).
In KP100G or KPL, 6 relays are built into. It is occupied whether to have turned on relays of a
side nears the grid (Relay4/5/6) among these. Similarly it shows whether to have turned on the relay
of a side near the inside (Relay1/2/3).
Grid Connect Photovoltaic Inverter KPG/KPL Communication Manual
1
Response code
Operating
(MRES+SRES)
statsus
1
4
2
Description
LSB
(Bit)
0
0
1)
[KP100G] Reservation
[KP40G / KPL] Stop
0
1
On grid instruction
1
0
Reservation
1
1
Reservation
0
2)
[KP40G] Excluding turning on both Relay3/4
[KP100G / KPL] Excluding turning on both Relay4/5/6
1
[KP40G] Turning on both Relay3/4
[KP100G / KPL] Turning on both Relay4/5/6
3)
[KP40G] Excluding turning on both Relay1/2
[KP100G / KPL] Excluding turning on both Relay1/2/3
[KP40G] Turning on both Relay1/2
[KP100G / KPL] Turning on both Relay1/2/3
4)
Gate Block
Excluding while blocking the gate
5)
[KP40G / KP100G] Reservation
[ KPL] Excluding turning on Relay N
[KP40G / KP100G] Reservation
[ KPL] Turning on Relay N
6)
Reservation
Error status
2
3
4
5
6
7
8
9
10 11 12 13 14
14
3 Compoway/F
3
3 - 15

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Kp**l seriesKp*l-od seriesKp40gKp100g

Table of Contents