Section 9: Periodic Maintenance; Periodic Maintenance - Nellcor NPB-75 Service Manual

Handheld capnograph / pulse oximeter
Table of Contents

Advertisement

SECTION 9: PERIODIC MAINTENANCE

9.1

PERIODIC MAINTENANCE

9.1
Periodic Maintenance
Periodic maintenance is recommended according to operating hours (refer
to section 4.2 "Service Level 1"):
The Pump and Flow System should be replaced every 7,000 operating
hours.
For replacing the pump, refer to section 7.5 "Replacing the Pump".
For replacing the flow system, refer to section 7.6 "Replacing the Flow
System".
The monitor should be returned to the manufacturer for periodic
maintenance every 14,000 operating hours.
9-1

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents