Vetus D-LINE VD4.120 Operation Manual page 91

Marine diesel engines
Table of Contents

Advertisement

7 Lay-up / Winter storage procedure
8 Electrical system
• Disconnect the battery cables.
• Charge batteries during winter lay-up regu-
larly if required!
n
ote
Never switch off the battery main switch di-
rectly after the engine has stopped.
Wait at least 2 minutes.
See page 37.
• Follow the recommendations given on
pages
52
to
55
or consult the recommen-
dations given by the battery supplier for in-
spection and maintenance of the batteries.
89

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

D-line vd4.140D-line vd6.170D-line vd6.210

Table of Contents