The following table supersedes the T101 Preventative Maintenance Table in the Maintenance Schedule section in the T101 Manual - PN 07266.
ITEM
ACTION
Replace scrubber
M501 SO2 scrubber
material
1
Particulate filter
Change particle filter
Verify test functions
Review and evaluate
Evaluate offset and
Zero/span check
slope
1
Zero/span
Zero and span
calibration
calibration
1
External zero air
Exchange chemical
scrubber (option)
1
Perform flow check
Check Flow
1
Sample chamber
Clean windows and
optics
filters
1
Critical flow orifice
Replace
& sintered filters
Internal IZS
Replace
Permeation Tube
Perform pneumatic
Verify Leak Tight
leak check
2
Pump diaphragm
Replace
PMT sensor
Low-level hardware
hardware calibration
calibration
Desiccant bags
Replace
1
These Items are required to maintain full warranty, all other items are strongly recommended.
2
A pump rebuild kit is available from TAPI Technical Support including all instructions and required parts (see Appendix B for part numbers).
51
07267B DCN6485

Table 8-1. T102 Preventive Maintenance Schedule

CAL
FREQUENCY
CHECK
As required
Yes
Weekly
No
Weekly
No
Weekly
--
7.2, 7.4, 7.5, 7.7,
Every 3 months
--
Every 3 months
No
Every 6 Months
No
Annually or as
Yes
necessary
Annually
Yes
Annually
YES
Annually or after
repairs involving
Yes
pneumatics
Every 2 years, or as
Yes
necessary
On PMT/ preamp
changes if 0.7 < SLOPE
Yes
or SLOPE >1.3
Any time sensor assy
inspection plate is opened
(reference Section 11.5.3)
T101 MANUAL
SECTION
9.1.1.3 of this
addendum
9.3.1
Appendix C
7.3, 7.6, 7.9
7,8
9.3.4
11.5.2
9.3.6
9.3.7
9.3.2
11.5.1
See instruction in
diaphragm kit
11.5.4
DATE PERFORMED