Wolf WRS-K Installation And Operating Instructions Manual page 38

Regulatory system
Table of Contents

Advertisement

Parameter setting list for "Cooling"
38
10. Operating level 2
Parameter
Switching time for chiller demand,
stage 2
Minimum runtime, stage
Times, stages Minimum ON
Minimum OFF
Switch delay stages,
same direct evaporator
Switch delay stages,
different direct evaporator
High pressure control, refrigerant circuit *
Low pressure control, refrigerant circuit *
Max. speed for pressure control *
Switching points, direct evaporator ON
stage 1
Switching points, direct evaporator OFF
stage 1
Switching points, direct evaporator ON
stage 2
Switching points, direct evaporator OFF
stage 2
Compressor block via supply air ON
Compressor block via supply air OFF
Enable compressor block
Compressor 1 block via outdoor air ON
Compressor 1 block via outdoor air OFF
Compressor 2 block via outdoor air ON
Compressor 2 block via outdoor air OFF
Integrated chiller
Fan min. stage
Fan min. speed
Chiller max. output
Chiller max. stage
Forced control of the fresh air damper 100 %
Setting range
Factory setting
2 - 100 %
50 %
0 - 20 min
6 min
0 - 999 s
420 s
0 - 999 s
420 s
0 - 999 s
0 s
0 - 999 s
60 s
-9.9 - 0 bar
-2.0 bar
0 - 9.9 bar
2.0 bar
0 - 100 %
100 %
- 9.9 - 9.9 K
0.5 K
- 9.9 - 9.9 K
- 0.5 K
- 9.9 - 9.9 K
1.5 K
- 9.9 - 9.9 K
- 0.5 K
10 - 24 °C
18 °C
2 - 20 °C
16 °C
Yes/No
Yes
0 - 30 °C
0 °C
0 - 30 °C
0 °C
0 - 30 °C
0 °C
0 - 30 °C
0 °C
Yes/No
No
1-3
3
20 - 100 %
100 %
20 - 100 %
100 %
1 - 2 stage
2 stage
Yes/No
Yes
3062878_201707

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

KlmBmkBmf

Table of Contents