Omron V700 series Operation Manual page 12

Reader writer
Hide thumbs Also See for V700 series:
Table of Contents

Advertisement

5)
FIFO Continue
After waiting for the Tag to approach, then communicates with the Tag
and transmits a response. After transmission is completed, Tag will
become inoperative. After transmitting a response, the Reader Writer will
await Tag to approach again if it receives [ACK], and CONTINUE UNTIL
THE READER WRITER RECEIVES A STOP COMMAND. When
communicating with the Tag, THERE MUST BE ONLY ONE ACTIVE
TAG within the transmission area.
♦ Operation Sequence
Upon receiving the command, the Reader Writer awaits Tag to approach.
When Tag is detected, the Reader Writer executes command and
transmits a response. Afterwards, when [ACK] is received, the Reader
Writer repeats the same operation. Once process is executed on a Tag,
the Tag becomes inoperative, and thus a Tag will only be processed once.
When the Reader Writer receives a STOP command, processing will
stop.
Comman
High-end→
←High-end
Tag
Transmission
Command Process
Tag Operation
6)
FIFO Repeat
After waiting for the Tag to approach, then the Reader Writer
communicates with the Tag and transmits a response. After transmission
is completed, Tag will become inoperative. THE READER WRITER
WILL CONTINUE PROCESS UNTIL IT RECEIVES A STOP COMMAND.
When communicating with the Tag, THERE MUST BE ONLY ONE
ACTIVE TAG (A TAG THAT IS NOT PROHIBITED FROM OPERATION)
within the transmission area.
♦ Operation Sequence
Upon receiving the command, the Reader Writer awaits Tag to approach.
When Tag is detected, the Reader Writer executes command and
transmits a response. Afterwards, the Reader Writer repeats the same
operation. Once process is executed on a Tag, the Tag becomes
inoperative, and thus a Tag will only be processed once. When the
Reader Writer receives a STOP command, processing will stop.
High-end→
Command
←High-end
Tag
Transmission
Tag Operation
ACK
Response 1
Tag
Detection
(Oscillation)
Tag 1
Response 1
Tag
Tag
Detection
Detection
Command Process Command Process
Command
Tag 1
NACK
Response 2
Tag
Detection
Command Process
Tag 2
Response 2
Response 3
Tag
Detection
Tag 2
Tag 3
(12/30)
STOP
Response 2
(Oscillation)
STOP
Respons
Tag
Detection
(Termination
Process)

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

V700-hmd11

Table of Contents