Installation And Commissioning Checklist; Installation / Gas Fitter Details - Rinnai 800 Operation & Installation Manual

Decorative flame fire
Hide thumbs Also See for 800:
Table of Contents

Advertisement

INSTALLATION / COMMISSIONING CHECKLIST
(To be completed by the Installer)
Models: (Constellation 800 / Constellation 1000)
Serial No: _______________________________
1. Has a gas leak test procedure been carried out?
2. Was a Rinnai flue system installed in accordance with the
instructions?
3. Have specified gas pressures been checked and set?
4. Are the black coals / river stones located correctly?
5. Have ember granules been placed and free of dust and
powder?
6. Has the appliance been test fired for correct operation?
7. Is the end-user fully aware of operation and safety
issues?
INSTALLERS / GAS FITTER DETAILS
Company name
Installers name:
Address:
Phone:
Certificate of Compliance / Certification Number
(* where applicable)
Authorised Persons – Licence Number: _______________________________
Signed
:________________________
Rinnai Australia
:
____________________________________________________
____________________________________________________
____________________________________________________
____________________________________________________
____________________________________________________
__________________
NO
Mobile:
__________________________
:__________________________
Date:___________________
- 23 -
Constellation Model 800/1000 - Installation Manual
YES

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

1000

Table of Contents