Installation/Commissioning Checklist; Installer Details - Rinnai LUMINA800BL Operation Manual And Installation Manual

Table of Contents

Advertisement

Installation/Commissioning Checklist
1 Was a fireplace inspection carried out?
(i.e. clearances, combustibles etc.)
2. Was a Rinnai approved flue system installed?
3. Has specified gas pressures been checked and set?
4 Are Coals/River Stones located correctly?
5. Have the granules been placed evenly on top of the burner,
free of dust and powder?
6. Has the appliance been test fired for correct operation?
7. Is the end-user fully aware of operating procedure?

Installer details

Company name:__________________________________________________________________
Installers name:___________________________________________________________________
Address:_________________________________________________________________________
________________________________________________________________________________
Phone: ________________________________ Mobile:___________________________________
Permit number for installation:______________________________________________________
Signed: _______________________________ Date:_____________________________________
Rinnai New Zealand
19
NO
YES
LUMINA

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents