Module 9206 Change the settings of the PLC soft keys

With Module 9206, the settings of individual PLC soft keys in the PLC soft-key
structure can be changed:
PLC soft keys can be locked and unlocked. Locked PLC soft keys cannot be
used.
PLC soft keys can be coupled to new operands. This way the status of the
PLC soft key is directly available in the PLC program.
Couple PLC soft-keys to operands that
• Unlock the PLC soft keys in a set state
• Lock the PLC soft keys in a reset state
If a locked PLC soft key is pressed, it sets the marker M4577.
Call:
PS
D
<Resource handle>
Resource handle from Module 9203
PS
B/W/D/K <Soft-key number>
PS
B/W/D/K <Function>
0: Lock soft key
1: Unlock soft key
2: Decouple soft key from assigned operand
3: Couple new operand to soft key
4: Decouple the soft-key unlocking/locking from the
assigned operand
5: Couple the soft-key unlocking/locking with the operand
PS
B/W/D/K <Operand address>
Only for function 3 and 5, otherwise transfer 0
PS
B/W/D/K <Operand type>
Only for function 3 and 5, otherwise transfer 0
0: Marker M
1: Input I
2: Output O
3: Counter C
4: Timer T
CM
9206
Error code:
Marker
Value
Meaning
M4203
0
No error
1
Error code in W1022
W1022
2
Incorrect resource handle or incorrect function
20
Module was not called in a spawn or submit job
44
Error during setting of setup parameters
8.3 PLC soft keys
1383