Agilent Technologies 1100 Series Reference Manual page 26

Fluorescence detector
Hide thumbs Also See for 1100 Series:
Table of Contents

Advertisement

1
Installing the Fluorescence Detector
5 Insert the flow cell and install the capillaries to the flow
cell (top is outlet, bottom is inlet).
7 Establish flow and observe if leaks occur.
The installation of the detector is now complete.
26
6 Connect the waste tubing to the bottom waste fitting.
8 Replace the front cover.
1100 Series FD Reference Manual

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents