Arriva Flue Components - Rinnai Arriva 752 Installation Manual

Hide thumbs Also See for Arriva 752:
Table of Contents

Advertisement

Arriva flue components

Direct A flue kit
Code:
R2731 (stainless steel)
Suitable for walls 115-240 mm thick,
typically weatherboard construction.
This is a complete kit with an inbuilt
2° fall to drain condensate, no other
components are required.
Arriva adaption flue kit
Code:
ASPKIT03
Elbow section of this component (circled) requires a 25 mm clearance from
combustibles, the rest is zero clearance.
Kit includes; flue transition (rotates), condensate trap, wall strap, drain tube
(750 mm), silicone grease, and flue slide stopper (4822), R1970 sub-kit. R1970 is a
sub-kit called the condensate drain kit. This is used for installations that require
draining of condensate back into the heater.
65 mm
115 mm
20 | Arriva 752 Installation Guide: 12218-F 06-18
Direct B flue kit
Code:
R2732 (stainless steel)
Suitable for walls 240-400 mm thick,
typically block construction.
This is a complete kit with an inbuilt
2° fall to drain condensate, no other
components are required.
Long End
Short End
Condensate
drain hose
Barb (top)
Condensate
Tube
90° Bend
Direct flue kit
Code:
Can be used as an alternative to the A
and B flue kits, and is suitable for walls
up to 385 mm (can be cut to length).
Can also be used in combination with
ESPIPE900 for longer flueing. Flue
terminal section is reusable when
making flue longer.
Vertical terminal
Code
Roof cowl and connecting pipe for
termination of a vertical flue—can be
cut to size.
Galvanised steel, powder coated black.
Condensate
tray
Wire Tie
ASPDFK (aluminium)
= ESROOFCOWL
Ø 195
Ø 50
Ø 75

Advertisement

Table of Contents
loading

This manual is also suitable for:

Rhfe752etrnRhfe752etrl

Table of Contents