Figure 2-10 6270 Oeu Pipe Mounting Installation - ABB XSeries G4 6200 User Manual

Flow computer
Table of Contents

Advertisement

2.2.7.1
Enclosure mounting brackets and fastening hardware are supplied with the unit.
The customer must provide a 2" pipe of suitable length (see Figure 2–10).
If a charging source, such as a solar panel, is desired, this procedure may be
configured to mount the solar panel on the upper portion of the pipe.
Step-by-step instructions
1) Using the instructions supplied with the mounting kit, attach the bracket to
2) Position the unit on the 2" mounting pipe, and secure in place with two U-
2.2.7.2
Before beginning, review the procedures and the materials required for
installation. A typical installation should look similar to Figure 2–11.
The enclosure mounting brackets and fastening hardware are supplied with the
unit.
2104349 rev. AD
Pipe mount
Figure 2–10 6270 OEU pipe mounting installation
Instructions assume that the user has completed the installation of
the 2" pipe.
the back of the enclosure unit.
bolts, flat washers, lock washers and two bolts (see Figure 2–10).
Wall mount
Page 2–11