Reversed Inlet Supplies - Mira 415 Installation And User Manual

Pressure balanced shower control
Hide thumbs Also See for 415:
Table of Contents

Advertisement

reversed Inlet supplies

Mira 415 shower controls are supplied with inlet connections hot left, cold right
and bottom outlet. The 415B is supplied with inlet connections hot left, cold right
and top outlet as standard.
Both shower controls are fitted with a single sequential control knob. The shower
control is turned off by turning the control knob fully clockwise. The correct sequence
of operation is anti-clockwise movement of the control knob followed by: Cold 
Warm  Hot water. If the sequence is: Hot  Warm  Cold water, then the hot
and cold water supplies have been reversed.
To correct reversed hot and cold inlet supplies proceed as follows:-
1.
Prise off concealing cap, remove control knob retaining screw/plastic
temperature override stop and control knob.
2.
Remove the hub. Turn the spindle one full turn (360
3.
Refit the control knob, (with the override button at the bottom), control knob
retaining screw/plastic override stop and concealing cap.
4.
Check the maximum temperature. Adjust if necessary (refer to
COMMISSIONING).
5.
Turn the knob fully clockwise to the shut off position.
6.
This completes the procedure for "Reversed Inlet Supplies".
Hub
Cover Shroud
Cover Shroud
Retaining Screws
Control Knob
Retaining Screw
32
). Refit the hub.
o
Control knob
Plastic Override
Stop
Concealing Cap

Advertisement

Table of Contents
loading

Table of Contents