Mira 415 Installation And User Manual page 23

Pressure balanced shower control
Hide thumbs Also See for 415:
Table of Contents

Advertisement

Mark the route of the incoming and outgoing pipework services.
Using the building-in shroud as a guide remove the plaster and brickwork/dry-
lining to the required depth of concealment.
noTe! The depth of concealment must be such that the final wall surface (e.g.
plaster and tiles etc.) finishes on the raised portion of the plastic building-in
shroud.
6.
Mark the final position in the wall chase of the two larger outer diameter fixing
holes in the flanges of the wall mounting bracket. This bracket must be fixed
at 45°.
7.
Drill and suitably plug the two marked fixing holes.
8.
Thoroughly flush the incoming hot and cold water supply pipes before
connecting the shower control (Byelaw 55).
23

Advertisement

Table of Contents
loading

Table of Contents