Mira 415 Installation And User Manual page 16

Pressure balanced shower control
Hide thumbs Also See for 415:
Table of Contents

Advertisement

1.11 Assemble the components of the inlet connector compression fittings in the
following sequence for each inlet:-
1.11.1 Place the fibre gasket against the shoulder of the
nipple.
1.11.2 Screw in, clockwise, the
compression taper faces uppermost, using a 12mm A/F hexagon wrench
(not supplied).
1.11.3 Slide, in turn, the compression nut, then the olive, over the hot and cold
inlet pipework. If necessary, sparingly, smear 'liquid jointing' on the pipe
end and the outside of the olive.
1.11.4 Insert the hot and cold inlet pipework into the opening of the
inlet connector nipple then slide the olive and compression nut into
place.
1.11.6 Finally, carefully tighten, clockwise, the compression nut using, if
necessary, a cloth to protect the plated surfaces.
Connector Nipple
Fibre Gasket
/
" BSP connector nipple ensuring that the
1
2
16
/
" BSP inlet connector
1
2
/
1
2
" BSP

Advertisement

Table of Contents
loading

Table of Contents