Fuel System - Kubota GL6000 Workshop Manual

Diesel generator
Table of Contents

Advertisement

GL6000, GL7000, GL9000, GL11000, WSM

(4) Fuel System

Injection Timing
1. Remove the injection pipes.
2. Set the speed control lever to the maximum fuel discharge
position.
3. Turn the flywheel counterclockwise (facing the flywheel) until fuel
flows from the delivery valve holder.
4. Continue to turn the flywheel slowly, and stop it as soon as the
fuel level at the tip of the delivery valve holder begins to increase.
5. Check to see if the timing lines (1) on the flywheel is aligned with
the alignment mark (2).
6. If the injection timing is out of adjustment, readjust the timing with
shims (3).
Injection timing
Factory spec.
NOTE
• The sealant is applied to both sides of the shim (soft metal
gasket shim).
The liquid gasket is not required for
assembling.
• Shims are available in thickness of 0.20 mm (0.0079 in.), 0.25
mm (0.0098 in.) and 0.30 mm (0.0118 in.). Combine these
shims for adjustments.
• Addition or reduction of shim (0.05 mm, 0.0020 in.) delays or
advances the injection timing by approx. 0.0087 rad (0.5 ).
• In disassembling and replacing the injection pump, be sure
to use the same number of new shims with the same
thickness
• Refer to figure below to check the thickness of the shims
(Reference)
• The alignment mark (2) of the injection timing line (1) is not in
alignment with the center of the timing window
• The above mark (2) comes aligned with the center of the flywheel
housing rib
(1) Timing
(2) Alignment Mark
(3) Shim (Soft Metal Gasket Shim)
1-S18
ENGINE
0.30 to 0.33 rad
(19 to 21 °) before top
dead center
(4) Two holes : 0.20 mm (0.0079 in.)
(5) One hole : 0.25 mm (0.0098 in.)
(6) Without hole : 0.30 mm (0.0118 in.)
W1018724
KiSC issued 05, 2015 A