Rinnai RHFE-308 FTR Installation And User Manual page 30

Energysaver space heater
Table of Contents

Advertisement

SLEEVE AND MANIFOLD INSTALLATION
5. Check rubber seal is in place on terminal.
* For weather board walls, add spare rubber
seal provided to compensate for weatherboard
angle.
6. Installation of Terminal
From outside, insert terminal into sleeve with
the "A" mark at the top. Left hand side fixing tie
is marked "LEFT" (from inside).
7. Attaching Ties
Pull hard on left and right hand side ties, clip
ties over lugs inside sleeve. You should be
able to pull ties 2 or 3 slots past the starting
point. Cut the ties, leaving about 20mm past
the lugs. Bend ties so they are parallel with the
wall.
8. Insert Inner Connection Assembly. Push
assembly into the terminal tube, make sure
"TOP" mark is uppermost. Fix with 3 screws
provided.
9. Manifold can still be turned after attaching.
METHOD FOR STANDARD WALLS
– 30 –
Terminal seal
(Add "weather board"
seal here)
Label
Fixing Tie
Cut (leave 20mm free)
Pull hard
Fixing tie
Lug
Screw
lnner
Connections
Outlet
Inlet
"TOP" mark "A"
Terminal
Terminal
Sleeve
Top Mark
Rubber cap

Advertisement

Table of Contents
loading

Table of Contents