Page 1
All Rinnai gas products ONLY THE FLUE SYSTEM COMPONENTS SPECIFIED IN THIS MANUAL MUST BE USED. COMPONENTS AND SYSTEMS are A.G.A. certified. NOT SPECIFIED IN THIS MANUAL, WHETHER MANUFACTURED BY RINNAI OR OTHERWISE, ARE NOT COMPATIBLE AND MUST NOT BE USED!
DO NOT instructions will void the warranty of an appliance and may cause injury or death. NOTE / IMPORTANT Important notes or general hints and guides provided to ease the installation. CAUTION Caution notes and or warnings that MUST BE observed for safe and correct installations. Rinnai POWER FLUED FLAMEFIRE FIM...
(ESROOFCOWL) are shown in exception of sub-floor ventilation: • Fig.1. • Other appliances • If in doubt contact Rinnai (phone number • Appliances over 50 MJ/h input and up to 150 MJ/h input 1000 1000 on the back page).
Use ONLY the supplied silicone based “O Ring” seal lubricant. DO NOT use petroleum based lubricants such as petroleum jelly. The use of petroleum jelly, CAUTION ® vaseline or similar petroleum based lubricants will cause deterioration of the “O” ring seals. Rinnai POWER FLUED FLAMEFIRE FIM...
INSTALLATION CONFIGURATIONS The following configurations are currently available. For alternative configurations contact Rinnai. DIRECT/EXTENDED Components Option A (Direct) Option B (Direct Extended) Direct Flue Kit Rinnai Flamefires ASPDFK Direct Flue Kit ASPDFK # Co-Ax Pipe 900mm (Optional) ESPIPE900 EXTERNAL WALL...
Page 7
8.5 metres x zero bends is permissible provided no bend is used in the flue transition connection. Note: The aluminium flue transition connection may contain one bend and this is counted as 1 (one) x 90° bend. IMPORTANT Rinnai POWER FLUED FLAMEFIRE FIM...
55 mm from base of enclosure 378 mm LEFT of centreline 580 mm from base of enclosure plus or minus 25mm RHFE-950ETR / RHFE-951ETR Flue pipe penetration Mark the location of the gas supply (consumer piping) and flue pipe penetrations from the centreline...
6. Refere to the chapter “Heater Installation” in the “Rinnai Operation / Installation Manual” supplied with the heater and complete the installation and commissioning of the heater in accordance with these.
6. Refere to the chapter “Heater Installation” in the “Rinnai Operation / Installation Manual” supplied with the heater and complete the installation and commissioning of the heater in accordance with these.
Finalise Installation & Commissioning of Heater. a - f Follow steps 1 through 5 from the chapter “Heater Installation” in the “Rinnai Operation / Installation Manual” supplied with the heater. The creation of the horizontal section of flue installation is the same as creating a DIRECT or DIRECT EXTENDED flue installations with the following exceptions: The direction of horizontal fall of the flue pipe is reversed.
Page 13
10. Refere to the chapter “Heater Installation” in the “Rinnai Operation / Installation Manual” supplied with the heater and complete the installation and commissioning of the heater in accordance with these.
6. Connect condensate drain tube to heater in accordance with the instructions on page 23. 7. Refere to the chapter “Heater Installation” in the “Rinnai Operation / Installation Manual” supplied with the heater and complete the installation and commissioning of the heater in accordance with these.
Direct Extended Flue Installations (As Required). Finalise Installation & Commissioning Of Heater. Follow steps 1 through 5 from the chapter “Heater Installation” in the “Rinnai Operation / Installation Manual” supplied with the heater. The Sideways flue installation can run along the left or right hand side of the internal wall behind the heater. When considering the location of the heater due care must be taken to ensure that the flue path is free of obstructions such as studs, noggins, joists, braces, and electricals etc.
Page 16
10. Refere to the chapter “Heater Installation” in the “Rinnai Operation / Installation Manual” supplied with the heater and complete the installation and commissioning of the heater in accordance with these.
(1) ESBEND (1 x 90°)! Follow steps 1 through 5 from the chapter “Heater Installation” in the “Rinnai Operation / Installation Manual” supplied with the heater. The Down and Out flue option allows for a Flue Adaption Kit (ASPKIT03) to face downwards and the flue to be run vertically though a hole in the floor, and then horizontally to a suitable location outside.
Page 18
9. Refere to the chapter “Heater Installation” in the “Rinnai Operation / Installation Manual” supplied with the heater and complete the installation and commissioning of the heater in accordance with these.
Silicone containing acetic acid, (characteristically having a vinegar odour), as the curing agent or other acids may cause corrosion of aluminium components and MUST NOT be used. Rinnai POWER FLUED FLAMEFIRE FIM...
For the on wall terminal it is CRITICAL that the inner pipe components are secured with rivets or screws and that the joints of PVC outer pipes are sealed with an appropriate PVC solvent. CAUTION Rinnai POWER FLUED FLAMEFIRE FIM...
COMPONENT ASSEMBLY AND CONNECTION ~ ESROOFCOWL When connecting an ESROOFCOWL to other flue components use the same methods as described for connecting ESPIPE900 and observe the clearance requirements detailed in the section “REGULATIONS, CLEARANCES & GENERAL INFORMATION” on page 4. Rinnai POWER FLUED FLAMEFIRE FIM...
The rubber cap (when supplied) is designed to fit both the left and right hand combustion air inlet and MUST cover the air inlet not in use. Rinnai POWER FLUED FLAMEFIRE FIM...
“short end first” making sure that the tray is centered under the end of the condensate tube that was installed in step 2. MODELS: RHFE-950, RHFE-951ETR & RHFE-1250ETR 1. Insert the barbed end of the condensate tube into the...
Braeside, Victoria 3195 For further information visit: www.rinnai.com.au Rinnai has a Service and Spare Parts network with personnel who are fully trained and equipped to give the best service on your Rinnai appliance. If your appliance requires service, please call our National Help Line. Rinnai recommends that this appliance be serviced every 2 years.