Finishing The Warmhearth; Completing The Facing; Non-Self Supporting, Thin Veneer Facades Installations; Masonry Kit Installation (Optional) - Regency Z2510L Owners & Installation Manual

Warmhearth fireplace
Hide thumbs Also See for Z2510L:
Table of Contents

Advertisement

FINISHING THE
WARMHEARTH

Completing the Facing

Facing materials must be thin veneer (non-self
supporting facades) or self supporting facades.
If you are installing a thin veneer facade the
Regency Masonry Retainer Kit (Part # 000-920)
is recommended. All facades must be Non-
Combustible such as brick, rock or ceramic
tile. See Clearance to Combustible diagram at
the beginning of this manual to determine the
extent to which you must use non-combustible
materials. Gypsum wallboard is not non-com-
bustible. Diagram 1.
Non-Self Supporting, Thin Veneer
Facades Installation:
1) Install heavy expanded metal only on the top
half of the fireplace using a drill to pre-drill
holes and install using tap screws at loca-
tions as indicated on kit.
2) Install metal edging of kit on each side of the
doors making sure the edges fit nicely with
the arch edge above.
3) Cover the rest of the area with wire mesh
or metal lath, overlapping around the heavy
expanded metal. Make sure nails or staples
used for fastening mesh penetrate studs at
least 1 in.
4) Mortar must be "thin set" or "thin bed" type
inherently polymer modified. If not modified,
you should add a synthetic latex additive.
Mix to a firm, moist consistency. Using a
plasterer's or mason's trowel apply mortar
1/2 in. to 3/4 in. thick to prepared surface
area. Do not spread more than a workable
area so that the mortar will not set up before
stone or brick is applied.
Note: Remove the fireplace doors and
louvers and store them in a safe
place until all the masonry work is
finished.
Acid from the cleaning
operation will permanently dam-
age gold plating.
5) If additional mortar is required, use a grout
bag to fill in joints. Care must be taken to
avoid smearing on the surface of stone or
brick.
Accidental smears should be re-
moved only after mortar has become crum-
bly, using a whisk broom or dry bristle
brush. Do not use a wet brush or a wire
brush.
6) When mortar joints have become firm (thumb-
print dry) they should be pointed up with a
wood stick or metal jointing tool.
Regency Z2510 WarmHearth
. .
. .
.
.
.
.
.
Diagram 1
Masonry Retainer Kit Option
For a non-selfsupporting veneer finish only.
1) Framing and plywood cannot ex-
tend past the side and top stand-
off spacers. Allow for the thick-
ness of the wall sheathing when
framing so that the front of the
WarmHearth and the wall sheath-
ing are flush.
2) Unscrew the top stand-off
and move the ceramic blan-
ket forward so it will be tight
against the mesh to make a
seal.
3) Mesh must be positioned one
way only to allow the mortar
to hold and not slide off.
Place "Middle" mesh (A) on
the front and position top
grill edge frame. Check di-
mensions from opening and
mark and drill screw holes.
Depending on the installa-
tion, heavier reinforcing wire
screen may be required to
bridge the stand-off spacer
area around the perimeter
of the unit. Hold in position
with 2 screws while the
door arch is centered.
INSTALLATION
Extend unit past
studs so it is flush
with sheeting.
Framing
.
.
. .
Metal
.
.
Edging
Drill & Tap
screws
.
Do not restrict air flow
through the inlet and
outlet louvers of the fire-
place. This will cause
overheating and possi-
ble ignition of sur-
rounding materials.
17

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents