Introduction
1.4 Commissioning guidelines
1.4
Commissioning guidelines
The steps for commissioning the safety functions form part of the activities for
commissioning the entire drive. Depending on whether you activate the safety functions via
fail-safe inputs or connect the inverter to PROFIsafe, we recommend that you use one the
following two commissioning procedures.
Activation via fail-safe digital inputs (F-DI)
12
Information on the commissioning
steps can be found in the following
sections or manuals:
①
STEP 7 manuals
②
Operating instructions
and
Fail-safe digital inputs (Page 43)
③
Operating instructions
④
Commissioning (Page 69)
⑤
Operating instructions
⑥
Acceptance test - Completion of
commissioning (Page 116)
Safety Integrated Function Manual, SINAMICS G120
Function Manual, 07/2010, FW 4.3.2, A5E03052391B AA