Post-Replacement Verification - Cisco MDS 9216 Configuration Manual

Mds 9000 series san volume controller
Hide thumbs Also See for MDS 9216:
Table of Contents

Advertisement

Replacing CSMs

Post-Replacement Verification

To perform a post-replacement verification, follow these steps.
Use the show nodes local command to verify that the nodes in the CSM have initialized without errors.
Step 1
If node does not initialize, the software version of the nodes on the replacement CSM may not be
compatible with the version running on the switch.
Wait for the nodes to initialize.
Step 2
Step 3
Add the nodes back to their clusters (see the
Tip
If the previous node used the default name, you cannot reassign the default name to the new node. If you
assigned a name to the old node, the new node can be assigned the same name.
Note
The Node ID of the replacement node is different from the node ID of the replaced node.
Use the SDD management tool on the host systems to verify that all paths are online.
Step 4
Cisco MDS 9000 Family SAN Volume Controller Configuration Guide
8-12
Chapter 8, "Upgrading CSM
78-16119-01, Cisco MDS SAN-OS Release 1.3
Chapter 8
Upgrading CSM Software
Software").

Advertisement

Table of Contents
loading

This manual is also suitable for:

Mds 9500 series

Table of Contents