5.6.1
Unpacking
Caution
RISK ASSESSMENT - Before commencing the installation it is
recommended that the "Five Steps to Risk Assessment" docu
ment published by the HSE is consulted, and an assessment per
formed as described. GAS SUPPLY - The gas supply, gas type
and pressure must be checked for suitability before connection.
See
Handling, page 9 before unpacking or lifting the boiler.
To unpack the boiler:
1. Remove the banding.
2. Open the flaps and remove the wall bracket.
3. Slide the sleeve upwards.
4. Remove the upper tray and installation kit.
5. Remove the upper packing piece.
Important
Care must be taken to avoid damage from any residual water in the