11. Install the access panel (Installing the access panel on page 25).
12. Install the server in the rack.
13. Connect each power cord to the server.
14. Connect each power cord to the power source.
15. Power up the server (Powering up the server on page 24).
16. Install drives.
Installing an 8 SFF display port/USB/optical blank option
Prerequisites
Before installing this option, be sure that you have the following:
•
The components included with the hardware option kit
•
T-10 Torx screwdriver
•
An optical drive, if installing
For more information, contact a Hewlett Packard Enterprise authorized reseller.
Procedure
1.
Back up all server data.
2.
Power down the server (Power down the server on page 24).
3.
Remove all power:
a. Disconnect each power cord from the power source.
b. Disconnect each power cord from the server.
4.
Do one of the following:
a. Extend the server from the rack (Extend the server from the rack on page 24).
b. Remove the server from the rack (Remove the server from the rack on page 25).
5.
Remove the access panel (Remove the access panel on page 25).
6.
Remove the universal media bay blank.
Installing an 8 SFF display port/USB/optical blank option
59