Yamaha Star XVS13AA(C) 2011 Service Manual page 125

Table of Contents

Advertisement

1. Left handlebar switch lead
2. Clutch cable
3. Meter assembly lead
4. Wire harness
5. Throttle cable (accelerator cable)
6. Throttle cable (decelerator cable)
7. Negative battery lead
8. Battery
9. Battery cover band
10. Tool kit tray
11. Tail/brake light wire harness
12. Main fuse
13. Fuse box
14. Starter relay
15. Fuel sender coupler
16. Air vent hose
17. Relay unit
18. Battery box
19. ECU (engine control unit)
20. Lean angle sensor
A. Secure the plastic locking tie by inserting the
projection on the tie into the hole in the bracket,
and then fasten the meter assembly lead, clutch
cable, and left handlebar switch lead with the tie.
Align the tape on the meter assembly lead and left
handlebar switch lead with the plastic locking tie.
Cut off the excess end of the plastic locking tie so
that the cut end does not protrude past the edge of
the bracket.
B. Insert the projection on each coupler into the hole
in the bracket.
C. Insert the projection on the wire harness holder
into the hole in the bracket.
D. Route the wire harness over the frame.
E. Fasten the wire harness to the frame with a plastic
locking tie at the location shown in the illustration.
Face the buckle of the plastic locking tie upward
with the end pointing inward.
F. Route the clutch cable under the wire harness.
G. Route the negative battery lead between the
battery and the tool kit tray, and then fasten the tray
and lead with the battery cover band.
H. Route the tail/brake light wire harness through the
guides on the tool kit tray.
I.
Slide the rubber cover over the neutral switch
coupler, speed sensor coupler, and oil level switch
coupler, making sure that the couplers are covered
completely.
J. Securely install the starter relay cover.
K. Secure the plastic locking tie by inserting the
projection on the tie into the hole in the frame. Face
the buckle of the plastic locking tie upward with the
end pointing inward.
L. Position the fuel sender coupler between the wire
harness and the air vent hose.
M. To fuel sender
N. Install the relay unit completely onto the tab on the
battery box.
O. Install the fuse box completely onto the tab on the
battery box.
P. Install the cover completely onto the ECU (engine
control unit) coupler.
Q. Install the starter relay completely onto the tab on
the tool kit tray.
CABLE ROUTING (for XVS13CA(C))
R. To O
sensor
2
2-98

Advertisement

Table of Contents
loading

This manual is also suitable for:

Star xvs13cta(c) 2011Star xvs13ca(c) 2011

Table of Contents