Installation On Finished Walls; Installation On Unfinished Walls - Wolf CGU-2-18 Installation And Maintenance Instructions Manual

Wall mounted gas fired combi boilers and wall mounted gas fired boilers with integral cylinder connection
Hide thumbs Also See for CGU-2-18:
Table of Contents

Advertisement

Installation on finished walls (accessory)
Heating flow Rp ¾"
DHW Rp ¾" (gas combi boilers)
Cold water Rp ¾" (gas combi boilers)
Heating return Rp ¾"
Gas connection Rp ½"
Drain for safety valve R 1"
Fig.: Front view, connection set for installation on finished walls
Fig.: View from below, connection set for installation on
finished walls
With boilers that are not used for DHW, seal the cold and DHW connections with locking
cap G ¾" (accessory).
If this is not done then the building and equipment may be damaged through uncontrolled
water leakages.
12
Installation on finished / unfinished walls
120
176
164
Installation on unfinished walls (accessory)
Heating flow R ¾"
DHW R ¾" (gas combi boilers)
Cold water R ¾" (gas combi boilers)
Heating return R ¾"
Gas connection R ¾"
Drain for safety valve R 1"
Fig.: Front view, connection set for installation on unfinished walls
Fig.: View from below, connection set for installation on
unfinished walls
120
200
164
3062347_0309

Advertisement

Table of Contents
loading

Table of Contents