Installation Information - Wolf CGU-2-18 Installation And Maintenance Instructions Manual

Wall mounted gas fired combi boilers and wall mounted gas fired boilers with integral cylinder connection
Hide thumbs Also See for CGU-2-18:
Table of Contents

Advertisement

Connection to room sealed balanced flue and flue gas chimney
19/20
Connector for flue gas chimney B32
The flue gas chimney connection (17)
must be installed directly to the flue gas
chimney in accordance with the figure
shown (no extension piece between
flue gas chimney and flue outlet).
The air vents to the boiler room must be
free from obstruction.
The relevant local flue inspector must
check the suitability of the flue chimney
before installation.

Installation information:

Flat roof:
Ceiling outlet
approx. 120 mm Ø
affix 13 into roof
cover.
Pitched roof: At 15 observe the
installation instructions
on the cowl, regarding
roof pitches.
Insert the roof outlet 8 from above
through the roof and secure vertically
with 16 to a rafter or brickwork.
Install the roof outlet only in its original
condition.
Modifications are not permissible.
If an inspection aperture is required for the balanced flue,
insert a balanced flue with inspection aperture (4). When the
LAF length is greater than 2 m, when installing the boiler in
a cold area and/or the required heating output lies below
15 kW, we recommend the installation of a three-layered-
roof outlet (insulated).
48
Engineering information – balanced flue system
e.g. System Plewa
17
16
15
8
14
13
19/20
e.g. System Schiedel
4
2b
Air apertures
1
Install with a 1-3% outwards slope.
Install the centring appliances near the end of the pipe.
If an inspection aperture is required for
the balanced flue, insert a balanced flue
with inspection aperture (4).
17
10
11
9
3062347_0309
12