Step 3: Unpack The Switch - NETGEAR GC510P Hardware Installation Manual

Insight managed 8-port gigabit ethernet poe+ smart cloud switch with 2 sfp fiber ports
Hide thumbs Also See for GC510P:
Table of Contents

Advertisement

Insight Managed 8-Port Gigabit Ethernet PoE+ Smart Cloud Switch with 2 SFP Fiber Ports
When unpacking a static-sensitive component from its shipping carton, leave it in the antistatic package
until you are ready to install it. Just before unwrapping the antistatic package, discharge static electricity
from your body.
Before moving a sensitive component, place it in an antistatic container or package.
Handle all sensitive components in a static-safe area. If possible, use antistatic floor pads, workbench
pads, and an antistatic grounding strap.

Step 3: Unpack the Switch

The following figure shows the package contents.
Figure 7. Switch package contents
Check the contents of the boxes to make sure that all items are present before installing the switch.
To check the package contents:
1.
Place the container on a clean flat surface, and cut all straps securing the container.
2.
Unpack the hardware from the boxes by carefully removing the hardware and placing it on a secure
and clean surface.
3.
Remove all packing material.
4.
Verify that the package contains the following items:
Switch of the correct model
Power cord
Wall-mounting screws
Rack-mounting brackets
Installation
24

Advertisement

Table of Contents
loading

This manual is also suitable for:

Gc510pp

Table of Contents