Step 2: Protect Against Electrostatic Discharge; Step 3: Unpack The Switch - NETGEAR GSS108E Hardware Installation Manual

8-port and 16-port gigabit ethernet (poe+) smart managed plus click switch
Hide thumbs Also See for GSS108E:
Table of Contents

Advertisement

8-Port and 16-Port Gigabit Ethernet (PoE+) Smart Managed Plus Click Switch
Step 2: Protect against electrostatic
discharge
WARNING:
Static electricity can harm delicate components inside your switch. To
prevent static damage, discharge static electricity from your body before you touch any
of the electronic components. You can do so by periodically touching an unpainted
metal surface on the switch.
You can also take the following steps to prevent damage from electrostatic discharge
(ESD):
• When unpacking a static-sensitive component from its shipping carton, leave it in
the antistatic package until you are ready to install it. Just before unwrapping the
antistatic package, discharge static electricity from your body.
• Before moving a sensitive component, place it in an antistatic container or package.
• Handle all sensitive components in a static-safe area. If possible, use antistatic floor
pads, workbench pads, and an antistatic grounding strap.

Step 3: Unpack the switch

The following figure shows the package contents.
Figure 12. Switch package contents
Installation
28
Hardware Installation Guide