Mount The Switch To A Pole Or Another Surface; Install The Switch In A Rack; Optional Step 5: Install Sfp Transceiver Modules - NETGEAR GC510P Hardware Installation Manual

Insight managed 8-port gigabit ethernet poe+ smart cloud switch with 2 sfp fiber ports
Hide thumbs Also See for GC510P:
Table of Contents

Advertisement

Insight Managed 8-Port Gigabit Ethernet PoE+ Smart Cloud Switch with 2 SFP Fiber Ports

Mount the Switch to a Pole or Another Surface

You can use an off-the-shelf 75 mm VESA standard mount to secure the switch to a pole or another surface.
The bottom panel of the switch provides four mount holes that are VESA-compliant.

Install the Switch in a Rack

To install the switch in a rack, you need the 19-inch rack-mount kit supplied with the switch.
To install the switch in a rack:
1.
Attach the supplied mounting brackets to the side of the switch.
2.
Insert the screws provided in the product package through each bracket and into the bracket mounting
holes in the switch.
3.
Tighten the screws with a No. 2 Phillips screwdriver to secure each bracket.
4.
Align the mounting holes in the brackets with the holes in the rack, and insert two pan-head screws with
nylon washers through each bracket and into the rack.
5.
Tighten the screws with a No. 2 Phillips screwdriver to secure mounting brackets to the rack.

Optional Step 5: Install SFP Transceiver Modules

The following optional procedure describes how to install an optional SFP transceiver module into one of
the SFP ports of the switch.
Installation
31

Advertisement

Table of Contents
loading

This manual is also suitable for:

Gc510pp

Table of Contents