Installing A Transceiver Module - HP FlexFabric 12900 series Installation Manual

Hide thumbs Also See for FlexFabric 12900 series:
Table of Contents

Advertisement

3.
Plug the other end of the power cable to the AC power receptacle of the power source and switch
on the circuit breaker.
4.
Connect all power cables, and turn on the power switch to the left of the power receptacle.
5.
Verify the power supply input/output status LEDs.
If all the LEDs are on, the power cables are correctly connected. For description of power supply
status LEDs, see
6.
Install the protection cover to the air intake vents at the lower part of the front panel. For installing
the protection cover, see
Figure 24 Securing the power cable

Installing a transceiver module

CAUTION:
Do not remove the dust cap from a transceiver module before connecting an optical fiber.
Remove the optical fiber, if any, from a transceiver module before installing it.
If no SFP+/SFP module or SFP+ cable is to be installed to the SFP+ port, do not remove the dust cap from
the port.
If no QSFP+ module or QSFP+/QSFP+ to SFP+ cable is to be connected to the QSFP+ port, install the
dust cap that comes with the LPU to the port.
The transceiver modules available for the switch include SFP, SFP+, and QSFP+.
"Appendix C
LEDs."
"Installing the
switch."
30

Advertisement

Table of Contents
loading

Table of Contents